0000192828
BGIS - PWGSC RP1
RFQ - Request for Quote (Formal)
GOC3450488 CS
GOC3450488 - CS - Millwork in 5 Areas
PU.DP.Que..8088.29965.C826102
Canada, Manitoba, Winnipeg
240 Graham Avenue Winnipeg MB
One Time Only- Delivery Date:Mar 26, 2021
Feb 11, 2021 05:01 PM CST
Not Available
Feb 19, 2021 02:00 PM CST
Yes
Feb 23, 2021 02:00 PM CST
Denise Sandulak
204-333-6294
Denise.Sandulak@bgis.com
Scope of Work/Overview: 1) Reception area - remove/demolish the built in reception desk in entirety (a free-standing reception desk will be designed and either purchase a prefab unit or fabricated by a millworker as a replacement); 2) Washroom - replace the existing vanity and two drawers with a new structure. (sink will remain as it is new last fiscal). Replace or re-surface the bench and shelving unit in the shower area. 3) Managers Office - remove the counter-top and below shelving in entirely (approximately 12 feet) and build a smaller counter top to cover a safe and one cupboard (approx. 4 feet). A sit stand desk will be incorporated and client already has procured. Carpet has been replaced and runs under the current millwork. 4) Kitchen - either re-surface or replace the entire counter-top. Sink, upper cabinets and below shelving will remain. 5) Large Boardroom - re-surface the counter-tops on either side of large cupboard (approx. 13 feet in total). Cabinets to remain as is. 6) Replace window coverings in 11 offices with roller shades - 37 shades in total.
Electronic Bid Submission
Lump sum
Property Management Supplier Compliance (BGIS)