Brief Scope:
The Contractor shall supply and install a security film on the glazing of doors and windows located on the building perimeter at both ground and second level.
The Contractor shall supply and install controlled keyway on several existing doors with bored locks in order to restrict the duplication of keys to authorized personnel only.
The Contractor shall supply and install an extension to the existing access control system on the double door leading to the elevator lobby in the basement. The system includes a card reader, door contacts, exit device (with delayed egress mechanism), an electric strike, door controller, and all necessary accessories for the installation of a fully operable system.
The Contractor shall supply and install deadbolt integrated mortise locksets, astragals and NRP hinges on several critical building infrastructure rooms to improve security.
The Contractor shall supply and install non-rated precast concrete planters to act as vehicle barriers for the main entrances of the Lionel Chevrier Building on Water street and Sydney street.
The contractor is to provide all cabling, junction boxes and conduits required for the work detailed in the attached documents.
Provide training to the end users and required personnel.
A start up and commissioning report is to be submitted by the contractor before the Client representative performs the final inspection.